Injection Moulding Machine Relocation and Installation for SMR Automotive
During the relocation of the injection moulding plant of SMR Automotive Mirror Technology Hungary Bt., we craned in and positioned 8 new injection moulding machines, removed 6 old machines and relocated 4 machine units within the hall. The work was scheduled to disrupt production as little as possible.
Challenge: replacing and rearranging machines while production continues
When an injection moulding plant is reorganised, new machines have to be brought in, old ones taken out and remaining units moved, all alongside ongoing production. At SMR Automotive, this meant moving 18 machines and machine units in total.
The heavy machines had to be craned, and the new equipment needed precision levelling to operate accurately.
Solution: planned craning, machine relocation and precision levelling
The work was based on a moving and craning schedule prepared in advance and aligned with production needs. The main tasks were:
- craning, moving and positioning 8 new injection moulding machines according to the layout,
- removing and storing 6 old injection moulding machines,
- relocating 4 machine units within the production hall,
- electrical disconnection and reconnection of the equipment, with the required electrical inspections,
- levelling the new machines to an accuracy of 0.02 mm/m,
- supporting the machine manufacturer during commissioning of the new equipment.
Machine moving and electrical connection were handled by the same team, so each machine could be prepared for commissioning as soon as it was in place.

Result: a renewed injection moulding plant on a new layout
The new injection moulding machines were handed over for commissioning in their layout positions, levelled to 0.02 mm/m, electrically connected and inspected. The old machines were removed from the production area, and the 4 relocated units took their place in the new arrangement.
Thanks to the agreed schedule, the machine fleet was replaced with minimal disruption to production.