Relocating a Studded Tyre Production Unit from Sweden to Hungary for Bridgestone

On behalf of Bridgestone Tatabánya Kft., we relocated a studded tyre production unit from Sweden to Hungary. The work ran from dismantling the production lines and backing up the PLC programs, through reinstallation and commissioning in Hungary, to supporting the production ramp-up and providing open-ended maintenance support.

Challenge: moving an entire production unit across borders

When a production unit moves between countries, the lines have to be dismantled, packed and shipped so that they can be rebuilt complete and working at the destination.

Alongside the physical relocation, the machines’ control programs had to be preserved, and the client also needed support after reinstallation, during ramp-up and in day-to-day operation.

Solution: production line relocation from dismantling to production support

We covered the relocation end to end:

  • dismantling, packing and loading the production lines onto transport vehicles in Sweden,
  • saving the PLC programs and creating backups,
  • reinstalling the production lines in Hungary,
  • commissioning the equipment,
  • production support during the ramp-up period,
  • open-ended maintenance support.

Because we both dismantled and reinstalled the lines, reassembly could draw directly on what we learned during dismantling.

Reinstalled conveyors and machine frames in the relocated production unit

Result: a production unit running in Hungary with long-term support

The production lines were reinstalled and commissioned in Hungary, and thanks to the PLC program backups the machines’ control logic was preserved.

We provide production support for the ramp-up and open-ended maintenance support afterwards, so the relocated lines are supported by the same partner that moved them.