Installation and Commissioning of a 40-Tonne Troester Extruder at Bridgestone Tatabánya

For Bridgestone Tatabánya Kft., we carried out the complete installation of a 40-tonne Troester extruder, from moving it into the production hall, through anchoring and mechanical assembly, to building the utility networks and preparing for commissioning.

Challenge: installing a 40-tonne extruder across multiple trades

Installing a heavy extruder brings several trades together: heavy machinery moving, precision mechanical work, and electrical and mechanical utility installation. These steps have to follow each other precisely for the machine to be ready for commissioning on time.

The 40-tonne machine had to be craned into the hall, anchored and levelled, its internal components fitted, the drive train aligned, and the electrical, compressed air, hydraulic and cooling water networks installed.

Solution: machinery installation from craning to utility networks

We carried out the installation in consecutive stages:

  • craning the 40-tonne Troester extruder and moving it into the production hall,
  • anchoring the base frame to the floor with chemical anchor bolts and levelling it,
  • installing and connecting the extruder screw, breaker pins and rotary joint,
  • laser shaft alignment of the motor-to-gearbox coupling,
  • installing high- and low-voltage electrical networks, compressed air, hydraulic and cooling water systems,
  • installing and commissioning local temperature control units,
  • making the occupational safety modifications required for commissioning.

Laser shaft alignment and chemical anchoring provide an accurate, stable connection between the drivetrain and the machine.

Result: a fully connected extruder ready for commissioning

The extruder was levelled, anchored, fitted with an aligned drive train and connected to every required utility network, ready for commissioning. The temperature control units were commissioned and the required safety modifications were completed.

The client received heavy machinery moving, mechanical assembly and utility connections from a single contractor.