Equipment Installation in a New Cleanroom Production Area for Henkel Hungary
In a new cleanroom production area of Henkel Magyarország Operations Kft., we installed 7 stainless steel, insulated, food-grade mixing tanks. Because of the low ceiling height and the hard-to-reach work area, we designed and built a custom lifting device, and we also installed, calibrated and load-tested the tanks’ load cells.
Challenge: installing tanks in a confined, hard-to-reach space
The mixing tanks had to be installed in an area where the low ceiling height and difficult access ruled out standard lifting equipment.
The existing steel structure had to carry additional load during installation, and the drives and load cells had to be fitted precisely.
Solution: a custom lifting device and structurally reinforced installation
We developed an installation method tailored to the site constraints:
- installing 7 stainless steel, insulated, food-grade mixing tanks,
- designing, structurally verifying and fabricating a custom lifting device for the low ceiling height,
- temporarily reinforcing the existing steel structure during installation,
- fitting gearboxes, electric motors and agitator shafts,
- installing load cells for the mixing tanks,
- calibrating and load-testing the load cells.
Our own structurally verified lifting device allowed the tanks to be placed safely in positions that conventional lifting equipment could not reach.
Result: production-ready mixing tanks with calibrated weighing
All 7 mixing tanks were installed in their positions, with gearboxes, motors and agitator shafts fitted, and with calibrated, load-tested load cells.
The custom lifting solution and temporary structural reinforcement made a safe installation possible despite the site constraints.